Support & Aftersales
support@azortum.com, +372 53053690

WASTE SORTING ENGINEERING IN PRACTICE

Waste Sorting Line Projects and Case Studies

Explore completed waste sorting and material recovery delivered for operators across the Nordics, Baltics, and Central and Eastern Europe.

Each case study presents the original process challenge, plant and installation constraints, engineered line concept, integrated separation technologies, and measurable operational results - from throughput and output purity to energy efficiency and production downtime.

View the full project, watch the sorting line in operation, or download the technical case study.

Waste Wood Shredding Line Upgrade with Zero Downtime

Norsk Gjenvinning processes over two million tonnes of waste annually and plays a key role in supplying secondary raw materials for energy production and manufacturing.

Their existing waste wood shredding line could no longer keep pace with demand — but replacing it was not a straightforward equipment swap.

Azortum_Norsk-Gjenvinning_Wood Shredding Line_1200x628

Packaging Waste Sorting Line Rebuilt for Speed, Purity, and Fire Safety

How Ecoservice rebuilt a critical packaging waste sorting operation in Vilnius in less than 12 months, achieving 12 t/h throughput, 10 clean output fractions, and up to 100% higher raw material recovery inside a fixed building envelope.

 

Wood Shredding Line Designed for Nordic Winters and Fuel Flexibility

How Jämtkraft increased recycled wood use from 20% to 75%, stabilized P63 fuel quality, and secured 70 t/h throughput for a new CHP plant supplying district heating to 50,000 residents.

 

MSW & Packaging Waste Sorting Line for Higher Recovery and Lower Energy Use

How Eco Baltia upgraded municipal solid waste and packaging waste processing with a high-throughput sorting line engineered for cleaner fractions, lower energy consumption, and long-term compliance with EU recycling targets.

Heavy-Duty C&D Waste Sorting Without the Energy Cost of a Shredder

How Azortum engineered a robust 25 t/h construction and demolition waste sorting line for CleanR Verso in Latvia - designed for abrasive material, harsh winter installation and cleaner output fractions.

Heavy-Duty C&D Waste Sorting Without the Energy Cost of a Shredder

Get in touch with Azortum!

Let’s talk – our sales engineers can help sort out the solution that fits your needs best.

We have received your information and will be in touch with you shortly. Thanks!